Manufacturing quality, paintwork

Since almost all machines that leave our premises are equipped with fertiliser and dressing, the load on all components is about the same as on a fertiliser spreader or a winter service vehicle.

All parts are drawn on a CAD system.
The machines are completely documented.

These parts are then laser cut, bent and welded by German suppliers.
All metal parts are sandblasted before powder coating.
A 0.2 mm primer is then powdered on.
In a second step, 0.2 mm top coat is also powdered onto this primer. 

In order to be able to maintain this quality without exception, we will manufacture the planting units ourselves from 2020.

Only cylinders and control blocks will be wet-painted: The rubber parts contained would fuse during powder coating at a baking temperature of about +180 °C.

Therefore, our standard is equal to or better than the standard of our market competitors.

Share by: